Tag Archives: 2014 Flood

RM provides answers to Frequently Asked Questions about Delta and the Flood

The DBA met with the RM in late August. In that meeting it was discussed what would be the best forum to get information to residents about what was going on at Delta in regards to fighting the on-going Flood. … Continue reading

Posted in Flood Related Posts | Tagged , , | Leave a comment

DRAFT of KGS Report

The RM has shared a copy of the DRAFT report KGS. Remember it’s done by engineers, so its a little difficult to de-code at first. Basically it’s a graph showing elevations of Land, buildings and existing wave protection. Here are … Continue reading

Posted in Flood Related Posts | Tagged , , , , | 4 Comments

Delta Flood Protection Update

Here is what we know as of today: KGS Draft Report has been received by the RM. KGS surveyed height of the entire Delta Beach residential area, has data for land height, building height, and resident built wave protection height … Continue reading

Posted in Flood Related Posts | Tagged , , , , , , | Leave a comment

More photos of Geotube construction

Courtesy of Don Clarkson

Image | Posted on by | Tagged , , , | 5 Comments

Some Good News: RM Continues to take action to try and protect Delta

Speaking with Daryl Hrehirchuk, CAO of the RM of Portage la Prairie, the RM is continuing to work to try and protect Delta Residents from the Flood and danger of severe damage from wind tide and wave. This includes: – … Continue reading

Posted in Flood Related Posts | Tagged , , , | 1 Comment

Defence Update

We are very pleased to report that the RM has been moving proactively to protect Delta. Yesterday the RM engaged Meseyton Construction to erect SuperSand bags to protect the Channel bridge, and allow access to the East Beach and Ridge … Continue reading

Posted in Flood Related Posts | Tagged , | 1 Comment