RM Proceeds with Tenders to Repair the Channel and Breakwater

The efforts to repair the channel and breakwater from damage sustained in the 2011 and 2014 floods, have proceeded from the design stage to the construction stage. The RM engaged AECOM to design the work, and develop tender documents. These are now available to interested parties on the RM’s website:

Click Here to View the Tender

It is hoped the work will be completed by the summer.

Advertisements

About scott greenlay

Administator
This entry was posted in General Posts Unrelated to Flood. Bookmark the permalink.

Leave a Reply or Provide Comments

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s