Monthly Archives: January 2019

RM Proceeds with Tenders to Repair the Channel and Breakwater

The efforts to repair the channel and breakwater from damage sustained in the 2011 and 2014 floods, have proceeded from the design stage to the construction stage. The RM engaged AECOM to design the work, and develop tender documents. These … Continue reading

Posted in General Posts Unrelated to Flood | Leave a comment